Optimal operation of Hoa Binh reservoir for flood control on Hong-Thai Binh river system

Ngo Huy Can, Nguyen Thanh Don, Nguyen Hong Phong, Nguyen Tuan Anh, Nguyen Van Que
Author affiliations

Authors

  • Ngo Huy Can Institute of Mechanics, VAST, Vietnam
  • Nguyen Thanh Don Institute of Mechanics, VAST, Vietnam
  • Nguyen Hong Phong Institute of Mechanics, VAST, Vietnam
  • Nguyen Tuan Anh Institute of Mechanics, VAST, Vietnam
  • Nguyen Van Que Airdefence and Airforce Academy

DOI:

https://doi.org/10.15625/0866-7136/30/3/5613

Abstract

In the paper the optimal operation of Hoabinh reservoir for flood control on Hong–Thai Binh river system is presented. The findings show that in the flood season in 1996 if the operation of gates and outlets of Hoa Binh reservoir was made base on the calculated release, the water level at Hanoi would be 12.3 m and the water level of Hoa Binh reservoir would be 98 m. So the calculated release from Hoabinh reservoir in August 1996 can be considered as optimal in the mean that the water level at Hanoi can be controlled and the Hoabinh reservoir still have necessary pool for controlling the next floods.

Downloads

Download data is not yet available.

Downloads

Published

01-10-2008

Issue

Section

Research Article

Most read articles by the same author(s)

1 2 > >>