Nghiên cứu các yếu tố ảnh hưởng đến việc hòa tách bùn thải có chứa đồng của quá trình sản xuất bản mạch điện tử

Nguyễn Thị Thu Huyền, Đặng Trung Dũng, Mai Thanh Tùng, Hoàng Thị Bích Thủy
Author affiliations

Authors

  • Nguyễn Thị Thu Huyền
  • Đặng Trung Dũng
  • Mai Thanh Tùng
  • Hoàng Thị Bích Thủy

DOI:

https://doi.org/10.15625/0866-7144.2017-00429

Keywords:

Copper muds, leaching, PCBs fabrication

Abstract

Copper recovery from waste mud of printed circuit boards (PCBs) via a three steps (leaching, filtration and electrowinning) process was studied. The copper mud was leached by the sulphuric acid leachant to form a concentrated copper ion solution for electrolysis. X-Ray diffraction, EDX, UV-Vis spectrophotometer, and ICP-MS analyses were done to characterize the structure and the ingredient of the solid samples and also determine the concentration of the liquid samples. The influences of the leaching solution content, concentration, time, temperature, ratio of solid and liquid phase, stirring speed and size of waste mud on the efficiency of waste mud leaching by sulfuric acid media were studied. The copper leaching was optimized done in the 1 M sulphuric acid solutions at room temperature for one hour. The solid/liquid phase ratio is 14 %, the copper mud grain size is 0.1 mm and the stirring speed is 600 rpm. The obtained results from this study are planning in the actual deployment of the Hanoi Urban Environment One Member Limited Company in Viet Nam.

Keywords. Copper muds, leaching, PCBs fabrication.

Downloads

Download data is not yet available.

References

J. Szałatkiewicz. Metals Content in Printed Circuit Board Waste, Polish Journal of Environment Study, 23, 2365-2369 (2014).

C.Vilarinho, A. Ribeiro, Carneiro, C and F. Castro. Recovery of copper and nickel hydroxide from galvanic sludge-Pilot scale experiment, 4th International conference on Engineering for Waste and Biomass Valorisation, 10-13 (2012).

F. Veglio, R. Quaresima, P. Fornari, S. Ubaldini. Recovery of valuable metals from electronic and galvanic industrial wastes by leaching and electrowinnin, Waste Management, 23, 245-252 (2003).

J. M. Magalhaes, J. E. Silva, F. P. Castro, J. A. Labrincha. Effect of experimental variables on the inertization of galvanic sludges in clay-based ceramics, Journal of Hazardous Material, 106B, 139-147 (2004).

L. Perez-Villarejo, S. Martinez-Martinez, B. Carrasco-Hurtado, D. Eliche-Quesada, C. Urena-Nieto, P. J. Sanchez-Soto. Valorization and inertization of galvanic sludge waste in clay bricks. Applied Clay Science, 105-106, 89-99 (2015).

A. Miskufova, T. Havlik, M. Laubertova, M. Ukasik, Hydrometallurgical route for copper, zinc and chromium from galvanic sludge, Acta Metallic Slovaca, 12, 293-302 (2006).

J. Wazeck. Heavy metal extraction from electroplating sludge using Bacillus subtilis and Saccharomyces cerevisiae, Geologica Saxonica, 59, 251-258 (2013).

Downloads

Published

28-02-2017

How to Cite

Thu Huyền, N. T., Dũng, Đặng T., Tùng, M. T., & Bích Thủy, H. T. (2017). Nghiên cứu các yếu tố ảnh hưởng đến việc hòa tách bùn thải có chứa đồng của quá trình sản xuất bản mạch điện tử. Vietnam Journal of Chemistry, 55(1), 121. https://doi.org/10.15625/0866-7144.2017-00429

Issue

Section

Articles