[1]
A. Do Ngoc, D. . Dias, and T. Trong Dang, “A numerical investigation of the impact of shield machine’s operation parameters on the settlements above twin stacked tunnels - A case study of Ho Chi Minh urban railway Line 1”, Vietnam J. Earth Sci., vol. 43, no. 4, pp. 409–423, Aug. 2021.