Do Ngoc, A., Dias, D. ., & Trong Dang, T. (2021). A numerical investigation of the impact of shield machine’s operation parameters on the settlements above twin stacked tunnels - A case study of Ho Chi Minh urban railway Line 1. Vietnam Journal of Earth Sciences, 43(4), 409–423. https://doi.org/10.15625/2615-9783/16442