(1)
Do Ngoc, A.; Dias, D. .; Trong Dang, T. A Numerical Investigation of the Impact of Shield machine’s Operation Parameters on the Settlements above Twin Stacked Tunnels - A Case Study of Ho Chi Minh Urban Railway Line 1. Vietnam J. Earth Sci. 2021, 43, 409-423.