[1]
Do Ngoc, A., Dias, D. and Trong Dang, T. 2021. A numerical investigation of the impact of shield machine’s operation parameters on the settlements above twin stacked tunnels - A case study of Ho Chi Minh urban railway Line 1. Vietnam Journal of Earth Sciences. 43, 4 (Aug. 2021), 409–423. DOI:https://doi.org/10.15625/2615-9783/16442.